Description: NOW REDUCED - OWNER WILL NEGOTIATE FOR REAL BUYER
BUILT FOR INSHORE CLUB RACING
THIS YACHT IS READY FOR THE 2022/ 23 RACING SEASON OR GREAT LEISURE YACHT
FSC BERTH AVAILABLE SUBJECT TO MEMBERSHIP (TERMS & CONDITIONS APPLY)
4 SINGLE BERTHS
NEW VULCAN 9 CHARTPLOTTER PLUS A RAYMARINE CHART C80 PLOTTER
ST70 INSTRUMENTS
CAT 3 SAFETY INVENTORY
OUT OF WATER LATE LAST YEAR (2022) FOR ANNUAL MAINTENANCE, HULL PREPPED AND ANTIFOUL, PROPSPEED APPLIED, SAILDRIVE SERVICED, ENGINE SERVICED, ALL SAILS SERVICED
HULL PAINTED 2016
TOPSIDE PAINTED YEARLY, INCLUDING ANTI SKID
CUSHIONS AND UPHOLSTERY REPLACED
|
Reference: | Y1598 |
Location: | Fremantle WA |
Region: | Western Australia |
Year: | 1997 |
Designer: | SWARBRICK |
Length: | 33' 6" - 10.20m |
Beam: | 3.3 m |
Draft: | 2.3 m |
Displacement: | 3.3 tonne |
Keel / Ballast: | LEAD KEEL |
Hull Material: | Timber CEDAR STRIP COATED WITH EPOXY RESIN |
Engine: | D20 VOLVO PENTA DIESEL |
Engine Make: | Volvo Penta |
Fuel: | 50 L |
Galley: | METHO STOVE
S/S SINK |
Refrigeration: | ICE BOX |
Accommodation: | 4 X SINGLE BUNKS |
Covers: | BOOM COVER |
Ground Tackle: | ANCHOR CHAIN AND ROPE |
Safety Gear: | CAT 3 SAFETY GEAR
NAVIGATION LIGHTS
EPIRB
FIRST AID KIT
2 MANUAL BILGE PUMPS
4 FIRE EXTINGUISHERS
FIRE BLANKET
OFFSHORE FLARES
SAFETY HARNESS
LIFE RING |
Electrics: | 12V
2 BATTERIES |
Electronics Navigation: | RAYMARINE ST2000 AUTO PILOT
VHF RADIO
NEW VULCAN 9 CHARTPLOTTER
RAYMARINE CHART C80 PLOTTER
ST70 INSTRUMENTS- LOG, WIND AND DEPTH
COMPASS |
Sail Inventory: | DOYLES SPECTRA (REPLACED 2016)
DOYLES NO. 2 SAIL - NEW
JIB REPLACED SEPT. 2016
3 X SYMMETRICAL AND 2 X ASYMMETRICAL
3 X SPINNAKER POLES |
Mast / Rigging: | 3/4 RIG
ALUMINIUM MAST
2 SPREADERS
CARBON SPINNAKER POLE
CARBON BOW SPRIT
STANDING RIGGING REPLACED SEPTEMBER 2016 |
Deck Gear: | 4 DECK WINCHES
2 FENDERS |
Remarks: | NOTE:
1. The particulars and specifications have been supplied by the seller. Such particulars and specifications have not been verified by Ben Lexcen Marine Brokers. It is the purchaser's responsibility to verify the accuracy of such particulars and specifications.
2. All items listed above are expected to be in working order unless otherwise noted |